PT AIR BATAM HULU

  • overview
    Production Capacity4,710 lps
    Pipe Network Length4.417 km
    Total Population Served± 1,363,000 persons
    Commercial Operation DateAugusts 1st, 2022
    Service AreaBatam Island
    PartnerBP Batam
    Lokasirewgwgh
DURIANGKANG WTP
Raw Water SourceDuriangkang Reservoir
Production Capacity2,700 lps
Commercial Operation Date
  • Augusts 1st, 2022 (Duriangkang 1-4)
  • Desember 31st,  2024 (Duriangkang 5)
Address

Jl. Bumi Perkemahan Raja Aji Kelana

Tanjung Piayu, Sei. Beduk, Kabil

Kec. Nongsa, Kota Batam

MUKA KUNING WTP
Raw Water SourceMuka Kuning Reservoir
Production Capacity950 lps
Commercial Operation Date
  • August 1st, 2022 (Muka Kuning 1)
  • Januari 17th, 2025 (Muka Kuning 2)
Address

Jl. Letjend Suprapto, Kabil, Kec. Nongsa

Kota Batam

TEMBESI WTP
Raw Water SourceTembesi Reservoir
Production Capacity230 lps
Commercial Operation DateDecember 31st, 2024
Address

Jl. Trans Barelang, Tembesi, Kec. Sagulung

Kota Batam, Kepulauan Riau 29472

TANJUNG PIAYU WTP
Raw Water SourceDuriangkang Reservoir
Production Capacity300 lps
Commercial Operation DateAugust 1st, 2022
Address

Jl. S. Parman, Kabul, Kec. Nongsa

Kota Batam

nongsa wtp
Raw Water SourceNongsa Reservoir
Production Capacity60 lps
Commercial Operation DateAugust 1st, 2022
Address

Jl. Hang Lekiu, Sambau, Kec. Nongsa

Kota Batam

sei ladi wtp
Raw Water SourceSei Ladi Reservoir
Production Capacity240 lps
Commercial Operation DateAugust 1st, 2022
Address

Jl. Gajah Mada, Baloi Indah,

Kec. Lubuk Baja, Kota Batam

 

sei harapan wtp
Raw Water SourceSei Harapan Reservoir
Production Capacity230 lps
Commercial Operation DateAugust 1st, 2022
Address

Jl. Kartini Raya, Sungai Harapan, Sekupang

Kompleak Pengairan Dam WTP Sei Harapan

Tj. Riau, Batam, Kota Batam